Green PM was involved in maintaining a busy high street store’s normal trading whilst carrying out major roof repairs and design works. The store also required mechanical and electrical refurbishment all carried out without any lost trading hours. Green PM contributed to a difficult arrangement of access, neighbours and construction detailing with a safe transformation whilst ensuring minimum disruption at high street level.

Project Details

  • Site: Watford High Street
  • CDM-C: Green Project Management
  • Architects: Squires and Brown
  • Structural Engineer : ABA Consulting
  • Timescale : 12 months